The nuclear renaissance people talk about isn't really a technology problem—it's a project development problem. David Faraday, co-founder of Elemental Power, put it bluntly: a better reactor, even a significantly better one, doesn't itself create a project. Someone still has to find a site, get it permitted with community support, sign a creditworthy customer for decades of power, navigate the interconnection queue and the NRC, assemble vendors and an operator, and figure out how to finance billions of dollars in stages. In every other power generation technology—gas, wind, solar, storage—that someone exists: the developer. In nuclear, it mostly doesn't. Utilities don't want early-stage risk, hyperscalers just want the power, and reactor OEMs are being forced into development when they should be focused on building their products. Faraday and his co-founders, all former Navy reactor operators turned energy finance professionals, built Elemental Power to fill that gap.

Finding sites and customers together

Continue reading the full summary in the app — free to try.

Read Full Summary →

Free • No credit card required

What you'll learn

  • 1 (00:07) **Shayle’s Core Thesis: The Bottleneck is Project Development, Not the Reactor** - Shayle argues that a nuclear renaissance requires solving the project development challenge, not just building a better reactor.
  • 2 (05:20) **Site Selection: Technical Screens, Community Will, and Customer Demand** - David explains the multi-layered process of finding a viable site for a new nuclear project, starting with where customers need power.
  • 3 (09:13) **Community Engagement & Interconnection Nuances** - David drills into two critical, often underestimated factors: winning community support and navigating interconnection queues.
  • 4 (13:50) **The Customer: Hyperscalers with a High Willingness to Pay** - The customer profile has shifted, making new nuclear viable; David explains who the ideal off-taker is and what they want.
  • 5 (17:56) **Assembling the Coalition: Offtake, Operator, and the Developer’s Role** - David clarifies that Elemental Power’s role is to assemble a coalition of large, creditworthy partners, not to build everything themselves.
  • 6 (20:05) **Reactor Selection: Why They Chose the BWRX-300** - David walks through their technology selection criteria, explaining why they picked a proven light-water SMR over advanced Gen 4 designs.
  • 7 (27:00) **Capital Formation: The Cost of Capital at Each Stage** - David breaks down the capital stack and the different return expectations from development through commercial operation.

+ Full timestamped outline available in the app

Show Notes

As the nuclear renaissance comes into focus in the U.S., the sector’s true bottleneck might not be advanced reactors, but its lack of heavy-lifting project developers. These are the companies who secure and permit sites, navigate the interconnection queue, line up offtakers, and assemble a team of both savvy EPCs and experienced plant operators. 

In this episode of Catalyst, Shayle Kann sits down with David Faherty, co-founder of Elementl Power, to walk through the soup-to-nuts playbook for delivering new nuclear projects in the United States. David explains everything from how his team approaches greenfield site screening, why early-stage development capital remains the hardest money to raise, and how portfolio-level structuring could unlock nuclear's elusive learning curve. 

Shayle and David also discuss:

- What makes a viable nuclear site, from seismic and geotechnical screenings to community engagement and interconnection dynamics

- Why 20- to 25-year investment-grade offtakes from hyperscalers are critical for debt financing

- Why Elementl opts for GE Hitachi’s BWRX-300 SMR over Gen IV startup reactor concepts

- Lessons learned from Vogtle — from the design phase and regulatory alignment to workforce retention

- How standardizing the nuclear island can help developers cut costs

Note: EIP is an investor in Elementl, where Shayle sits on the board.



- Catalyst: The global geopolitics of nuclear fuel

- Catalyst: A blueprint for scalable fusion power

- Catalyst: Building a domestic nuclear fuel supply chain

- Catalyst: The path to market for new nuclear reactors 

- Open Circuit: Is commercial fusion finally near?

- Latitude Media: DOE Is dedicating $17.5 billion in loans to the nuclear supply chain


Credits: Hosted by Shayle Kann. Produced and edited by Max Savage Levenson. Original music and engineering by Sean Marquand. Stephen Lacey is our executive editor.

Catalyst is brought to you by GridBeyond. GridBeyond is the world’s leading technology platform for managing distributed and flexible energy resources. Learn more by visiting GridBeyond.com.

Catalyst is brought to you by Antenna Group, the strategic communica

Catalyst with Shayle Kann

More from this podcast

Catalyst with Shayle Kann →